Interactive
Well Map
Loading Events

Meetings & Events

This event has passed.

Canceled

CANCELLATION of Permit Hearing

April 14, 2021 @ 1:30 pm

Clearwater Underground Water Conservation District

700 Kennedy Court
Belton, TX 76513 United States

NOTICE of CANCELLATION

OF PERMIT HEARING OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT

In accordance with Governor Abbott’s declaration of the COVID-19 public health threat, action to temporarily suspend certain provisions of the Texas Open Meetings Act, and Executive Order, a quorum of CUWCD’s Board of Directors will NOT hold this scheduled Public Hearing as previously noticed. Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District having set the public hearing for April 14, 2021 at 1:30 p.m., HAS CANCELLED THE SAID HEARING UNTIL FURTHER NOTICE. Applications for Permits as described below will not be heard as previously noticed, in compliance with the Texas Open Meetings Act.  The public may access future meeting and make public comment by going to the District Website http://www.cuwcd.org/ for the contact information and instructions of which will be available per a future notice.

 The hearing will NOT be conducted on the following applications:

Applicant’s File Number/Name Permit Applicant/Holder and Landowner Location of Well/Wells Proposed Annual Groundwater Withdrawal Amount & Purpose of Use
Continue Operating Permit Hearing

related to:

 

N2-20-007G

Existing Well

 

Victory Rock TX LLC

c/o Jon Taliaferro

Project Manager

Sage ATC Environmental

715 Discovery Blvd, Suite 301

Cedar Park, TX 78613

 

361-215-9994

 

Existing well will be reworked and equipped with a maximum 2-inch column pipe for a submersible pump rated at 18.6 gallons per minute on the 283-acre tract located at 7170 Solana Ranch Rd West, Jarrell Texas 76537-5008,

 

Latitude 30.876156º

Longitude -97.609424º

 

 

 

 

Request for an Operating Permit on an existing well,

 

N2-20-007G

for withdrawal of 30 acre- ft/year or 9,775,000 gallons per year, from the Hensell layer (Middle) of the Trinity Aquifer with a 2-inch column pipe at 18.6 gallons per minute to produce groundwater for the purpose of mining and crushing aggregates.

 

Combination Drilling &

Operating

Permit

 

N2-21-001P

 

 

 

 

Victory Rock TX LLC

c/o Jon Taliaferro

Project Manager

Sage ATC Environmental

715 Discovery Blvd, Suite 301

Cedar Park, TX 78613

 

361-215-9994

 

 

 

New well will be drilled and equipped with a maximum 2-inch column pipe for a submersible pump rated at 20 gallons per minute on the 283-acre tract located at 7170 Solana Ranch Rd West, Jarrell Texas 76537-5008,

 

Latitude 30.878055º

Longitude -97.609444º

Request for a Combination Drilling/Operating Permit from a new well,

 

N2-21-001P

for withdrawal of 30 acre- ft/year or 9,775,000 gallons per year, from the Hosston layer (Lower) of the Trinity Aquifer with a 2-inch column pipe at 20 gallons per minute to produce groundwater for the purpose of mining and crushing aggregates.

 

Combination Drilling & Operating Permit

 

 

N1-21-001P

 

 

 

 

Kelly Carter

P.O. Box 339

Holland TX 76534

 

512-560-2573

 

 

Permit will authorize the withdrawal from a new well completed in the Alluvial Aquifer with a 1 ¼-inch column pipe on a 4.01-acre tract located at 15526 Hawk Lane, Holland, Texas,

 

Latitude 30.869424º

Longitude -97.359764º

Request for a Drilling Permit to construct and complete a well for domestic use.

 

N1-21-001P to be drilled and completed for withdrawal 0.87 ac-ft per year or 283,970 gallons per year from the Alluvial Aquifer with a 1 ¼ inch column pipe at 5 gallons per minute to produce groundwater for domestic use.

The Applications for Permit and Permit Amendments, if granted, would authorize the permit holders to operate wells within the Clearwater Underground Water Conservation District according to the terms and conditions set forth in the permit.

 

ISSUED this 7st day of April 2021 in Belton, Texas, on the recommendation of the General Manager.

 

I, the undersigned authority, do hereby certify that the above NOTICE OF CANCELLATION OF SAID PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice.  I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on April 7, 2021, and remained posted continuously for at least 10 (ten) days immediately preceding the day of said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.

 

Dated 04/07/2021
Clearwater Underground Water Conservation District
By:  Click here for original signed document
Dirk Aaron, General Manager

Categories: