NOTICE OF PERMIT HEARINGS OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT
Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District will conduct public hearings on the permits as described below at 1:30 p.m. on Wednesday, February 16, 2022, in the Clearwater UWCD Board Room located at 700 Kennedy Court, Belton, Texas, in compliance with the Texas Open Meetings Act.
The public hearings will be conducted on the following applications:
Applicant’s File Number/Name | Permit Applicant/Holder and Landowner | Location of Well/Wells | Proposed Annual Groundwater Withdrawal Amount & Purpose of Use |
Continuance of
Operating Permit Hearing related to:
N2-20-008P Existing Well
N2-20-009P Existing Well |
Whitley 20 Stillman Valley LLC
c/o Russell Spillers Texas Veterans Properties LLC 8127 Mesa Dr. #206-53 Austin, TX 78759
(512) 814-7357
|
The proposed permits are for two wells located at:
Well #1 (N2-20-008P): Latitude:30.928700º Longitude: -97.7168527º
Well #2 (N2-20-009P): Latitude 30.928214º Longitude -97.717865º
Completed to the Hosston Layer of the Trinity Aquifer. The wells are equipped with a maximum 2-inch column pipe with a submersible pump rate not to exceed 17 gallons per minute on the 43.435-acre tract located on the corner of Stillman Valley Road and Firefly Road, Florence, TX
|
Request for an Operating Permit on an existing well,
Well #1: N2-20-008P for an operating permit authorized to serve 7 homes and not to exceed 1.95 ac-feet/yr or 634,662 gallons per year.
Well #2: N2-20-008P for an operating permit of authorized to serve 7 homes and not to exceed 1.95 ac-feet/yr or 634,662 gallons per year.
Both wells are completed in the Hosston Layer (Lower Layer) of the Trinity aquifer to produce groundwater for domestic us in a shared well agreement. |
Combination
Drilling & Operating Permit Hearing related to:
N1-21-004P |
Scott Gillman 7573 Chaparral Rd. Killeen, TX 76542 |
6.704-acre tract located at 7573 Chaparral Road, Killen, Texas
1 Proposed well in the Middle Trinity Aquifer with a 1 ¼ inch column pipe and maximum 17gpm.
Latitude 31.024884º Longitude -97.667624º
|
.389 acre-feet per year or 127,020 gallons per year from the Middle Trinity Aquifer for domestic use. |
The Applications for Permit and Permit Amendments, if granted, would authorize the permit holders to operate wells within the Clearwater Underground Water Conservation District according to the terms and conditions set forth in the permit. A person wishing to submit a Contested Case Hearing Request who is unable to appear at the hearing on the date and time set forth above must also file a motion for continuance with CUWCD demonstrating good cause for the inability to not appear.
For additional information about this application or the permitting process, or to request information on the legal requirements on what MUST be included for a Contested Case Hearing Request to be valid, please contact CUWCD at 700 Kennedy Court (PO Box 1989) Belton, Texas, 76513, 254-933-0120.
ISSUED this 2nd day of February 2022 in Belton, Texas, on the recommendation of the General Manager.
I, the undersigned authority, do hereby certify that the above NOTICE OF PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice. I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on February 2, 2022, and remained posted continuously for at least 10 (ten) days immediately preceding the day of the said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.
Dated 2/2/2022
Clearwater Underground Water Conservation District
By: Click here for original signed document
Dirk Aaron, General Manager