NOTICE OF PERMIT HEARING OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT

Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District will conduct a hearing on two Applications for Permit as described below at 10:00 a.m. on Wednesday, November 11, 2026, Clearwater UWCD Board Room located at 640 Kennedy Court, Belton, Texas, in compliance with the Texas Open Meetings Act.

The hearing will be conducted on the following applications:

Applicant’s File Number/Name Permit Applicant/Holder and Landowner Location of Well/Wells Proposed Annual Groundwater

Withdrawal Amount & Purpose of Use

 

Operating Permit Amendment Hearing

related to:

 

N2-15-004P &

N2-15-005P

 

Mike & Lacey Guthrie

2706 Marie Lane
Salado, TX 76571

(512) 796-4737

 

The existing wells are completed to the Edwards BFZ Aquifer and equipped with a 1 ¼ -inch column pipe. The wells are located in the Edwards BFZ Management Zone on contiguous tracts totaling 11.34 acres located at 2706 Marie Lane, Salado, TX 76571.

 

N2-15-004P

Latitude 30.956849º  Longitude -97.500971º

N2-15-005P

Latitude 30.957173º  Longitude -97.500827º

 

 

This proposed amendment will authorize two existing wells to be aggregated into a single permit, not to exceed 1.2 acre-feet per year or 391,021 gallons per year, for domestic use, at a maximum pumping rate of 7 gallons per minute. This amendment will not authorize any additional production.

 

Drilling Permit Hearing

related to:

 

N3-26-003P

 

 

Jarrell Schwertner Water Supply Corporation

 

c/o Dr. Neil Deeds

9600 Great Hills Trail Suite 300W

Austin, TX 78759

 

(512) 506-1230

 

The proposed well will be completed in the Lower Trinity Aquifer (Hosston) and equipped with a maximum 8-inch column pipe. The well will be located in the Eastern Management Zone on contiguous tracts of land (PID:399357, 333720, 333721, 399355, 333722, 55319, 55318) totaling 4.7 acres, in the northern portion of JSWSC’s service area at Hackberry Road and FM 2115, Salado TX 76571.

 

 

Latitude 30.883351º

Longitude -97.557116º

 

 

The proposed well will produce groundwater for a TCEQ-approved public water supply system, CCN #10002, to provide public water to customers exclusively in Bell County.

This drilling permit will not authorize any production of groundwater other than what is necessary for the prescribed aquifer pumping test.

 

This application for a drilling permit only contemplates a future application for an operating permit. The proposed annual quantity is not to exceed 400 acre-feet per year or 130,340,400 gallons per year, at a maximum withdrawal rate of 600 gallons per minute.

 

 

The Application for Permit, if granted, would authorize the permit holder to operate wells within the Clearwater Underground Water Conservation District according to the terms and conditions set forth in the permit. A person wishing to submit a Contested Case Hearing Request under District Rule 6.10.15(d) who is unable to appear at the hearing on the date and time set forth above must file a motion for continuance with CUWCD demonstrating good cause for the inability to not appear.

 

For additional information about this application or the permitting process, or to request information on the legal requirements on what MUST be included for a Contested Case Hearing Request to be valid, please contact CUWCD at 700 Kennedy Court, Belton, Texas, 76513, 254-933-0120.

 

ISSUED this 30th day of October 2026 in Belton, Texas, on the recommendation of the General Manager.

 

I, the undersigned authority, do hereby certify that the above NOTICE OF PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice.  I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on October 30, 2026, and remained posted continuously for at least 10 (ten) days immediately preceding the day of said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.

 

Dated 10/30/2026

Clearwater Underground Water Conservation District

By:  Click here for original signed document
Whitney Ingram, General Manager