Loading Events

« All Events

  • This event has passed.

Permit Hearing

June 16, 2021 @ 1:30 pm

 NOTICE OF PERMIT HEARING OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT

 

In accordance with Governor Abbott’s declaration of the COVID-19 public health threat, action to temporarily suspend certain provisions of the Texas Open Meetings Act, and Executive Order, a quorum of CUWCD’s Board of Directors will hold this scheduled Public Hearing by telephonic conference call and, for redundancy, videoconference. Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District have set the public hearing set for June 16, 2021, at 1:30 p.m. Applications for Permits as described below will be heard as described above, in compliance with the Texas Open Meetings Act.  The public may access this meeting and make public comment by phone, pc, tablet and/or notebook by going to the District Website http://www.cuwcd.org/ for the contact information and instructions of which will be available on June 11, 2021. 

 

The hearing will be conducted on the following applications:

Applicant’s File Number/Name Permit Applicant/Holder and Landowner Location of Well/Wells Proposed Annual Groundwater Withdrawal Amount & Purpose of Use
Operating Permit Hearing

related to:

 

N2-21-002G

Existing Well

 

R&A Hauling

c/o Roy Navarro

8151 Smith Dairy Rd

Belton, TX 76513

 

254-534-4010

 

Existing well will be reworked and equipped with a maximum 1 ¼ -inch column pipe for a submersible pump rated at 1.5 gallons per minute on the 2.941-acre tract located at 7900 S I-35, Belton, TX 76513

 

Latitude 30.988984º

Longitude -97.502085º

 

 

 

 

Request for an Operating Permit on an existing well,

 

N2-21-002G

for withdrawal of 1.34 acre- ft/year or 436,640 gallons per year, from the Edwards BFZ Aquifer with a 1 ¼ inch column pipe at 1.5 gallons per minute to produce groundwater for the purpose of commercial landscape and propagation.

 

Combination Drilling &

Operating

Permit

 

N1-21-002P

 

 

 

 

David & Denea Reaves

21625 State Highway 195

Killeen, TX 76542

 

254-220-1499

 

 

 

New well will be drilled and equipped with a maximum 1 ¼ -inch column pipe for a submersible pump rated at 7 gallons per minute on the 1.785-acre tract located at 21625 State Highway 195

Killeen, TX 76542

 

Latitude 30.931615º

Longitude -97.793143º

Request for a Combination Drilling/Operating Permit from a new well,

 

N1-21-002P

for withdrawal of 0.54 acre- ft/year or 175,200 gallons per year, from the Hosston layer (Lower) of the Trinity Aquifer with a 1 ¼ -inch column pipe at 7 gallons per minute to produce groundwater for the purpose of domestic use.

 

 

The Applications for Permit and Permit Amendments, if granted, would authorize the permit holders to operate wells within the Clearwater Underground Water Conservation District according to the terms and conditions set forth in the permit.

 

GUIDELINES FOR PUBLIC PARTICIPATION IN CLEARWATER UNDERGROUND

WATER CONSERVATION DISTRICT BOARD MEETING, WORKSHOP AND HEARINGS

 

Clearwater UWCD, in order to maintain governmental transparency and continued government operation while reducing face-to-face contact for government open meetings, is implementing measures according to guidelines set forth by the Office of the Texas Governor, Greg Abbott. In accordance with section 418.016 of the Texas Government Code, Governor Abbott has suspended various open-meetings provisions that require government officials and members of the public to be physically present at a specified meeting location. CUWCD’s adherence to the Governor’s guidance temporary suspension procedure ensures public accessibility and opportunity to participate in CUWCD’s open meeting, workshop, and hearings.

Members of the public wishing to make public comment during the meeting must register by emailing schapman@cuwcd.org  prior to 11:30 a.m. on June 16, 2021.  This meeting will be recorded, and the audio recording will be available by contacting the CUWCD’s staff after the meeting. A copy of the agenda packet will be available on the CUWCD’s website at the time of the meeting.

If you would like to support, protest, or provide comments on this application, you must comply with District Rule 6.10 and either appear by phone or video conference during the hearing or submit a written Contested Case Hearing Request that complies with District Rule 6.10 and that must be received by the District prior 11:30 a.m. on the date of the hearing by accessing the form at:

http://www.cuwcd.org/wp-content/uploads/2020/03/Hearing-Registration-eForm-19MAR20.pdf

 

Public Comment forms can be assessed at: http://www.cuwcd.org/wp-content/uploads/2020/03/Public-Comment-eForm-19MAR20.pdf

 

You may join Clearwater UWCD Regular Board Meeting, Permit Hearing and Workshop

  • Wed, Jun 16, 2021, 1:30 PM – 5:30 PM (CDT)
  • Please join the meeting from your computer, tablet or smartphone.

https://global.gotomeeting.com/join/984265421

  • You can also dial in using your phone.

United States (Toll Free): 1 866 899 4679 Access Code: 984-265-421

 

A person wishing to submit a Contested Case Hearing Request who is unable to appear at the hearing on the date and time set forth above must also file a motion for continuance with CUWCD demonstrating good cause for the inability to not appear by phone and/or video.

For additional information about this application or the permitting process, or to request information on the legal requirements on what MUST be included in a Contested Case Hearing Request to be valid, please contact the CUWCD at 700 Kennedy Court (PO Box 1989) Belton, Texas, 76513, 254-933-0120.

ISSUED this 4th day of June 2021 in Belton, Texas, on the recommendation of the General Manager.

I, the undersigned authority, do hereby certify that the above NOTICE OF PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice.  I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on June 4, 2021, and remained posted continuously for at least 10 (ten) days immediately preceding the day of said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.

 

Dated 06/4/2021

Clearwater Underground Water Conservation District

By: Click here for original signed document

Dirk Aaron, General Manager

Details

Date:
June 16, 2021
Time:
1:30 pm

Venue

Clearwater Underground Water Conservation District
700 Kennedy Court
Belton, TX 76513 United States
+ Google Map
Phone:
254-933-0120
Website:
www.cuwcd.org