Interactivo
Mapa del pozo
Cargando Eventos

Reuniones y eventos

Este evento ha pasado.

Aviso de audiencia de permiso

marzo 12, 2025 @ 1:30 pm - 2:30 pm

Sala de juntas del UWCD de Clearwater

640 Kennedy Court
Belton, Texas 76569 Estados Unidos

NOTICE OF ENCUMBRANCE HEARING & PERMIT HEARING OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT

Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District will conduct a hearing on three Applications for Permits as described below at 1:30 p.m. on Wednesday, March 12, 2025, in the Clearwater UWCD Board Room located at 640 Kennedy Court, Belton, Texas, in compliance with the Texas Open Meetings Act.

La audiencia se llevará a cabo sobre las siguientes solicitudes:

Applicant’s File Number/Name Permit Applicant/Holder and Landowner Location of Well/Wells Cantidad propuesta de extracción anual de agua subterránea y propósito de uso
Drilling Permit Hearing related to:
Well #
N3-25-001P
Salado I.S.D.c/o Ted Smith

601 N. Main Street
Salado, TX 76571

(254) 947-6901

Well # N3-25-001P

The proposed new well will be completed to the Middle Trinity Aquifer and equipped with a maximum 2-inch column pipe at a maximum pumping rate of 100 gallons per minute. The proposed well will be located in the Stillhouse Hollow Management Zone on the 54.69-acre tract located at 3689 Williams Rd, Salado, TX 76571.

Latitude 30.96579º
Longitude -97.54327º

The proposed new irrigation well would be aggregated into a two-well system with an existing operating permit not to exceed 21.41 acre-feet or 6,976,470 gallons per year, at a maximum pumping rate of 100 gallons per minute. No additional groundwater will be contemplated by this application above the existing operating permit.
Amendment to Operating Permit Hearing
related to:4 Well Aggregate System
Well #
N2-03-004G
N3-23-008G
N3-23-006G
N3-23-007G
Salado I.S.D.c/o Ted Smith

601 N. Main Street
Salado, TX 76571

(254) 947-6901

Well #:
N2-03-004G (Latitude 30.950109º/Longitude -97.540834º)
N3-23-008G (Latitude 30.951391º/Longitude -97.542874º)
N3-23-006G (Latitude 30.949184º/Longitude -97.542085º)
N3-23-007G (Latitude 30.949149º/Longitude -97.545345º)The existing wells are completed to the Edwards BFZ Aquifer and are equipped with a maximum 1¼ -inch column pipe at a maximum pumping rate of 10 gallons per minute. The wells are located in the Edwards BFZ Management Zone on contiguous tracts of land (PID 102187 and PID 102190) totaling 45.593 acres, at 575 Salado School Rd, Salado, TX 76571.
An operating permit of 1.5 acre-feet per year is being contemplated for three existing wells (N3-23-006G, N3-23-007G, N3-23-008G). These permits would be aggregated with the current 1.5 acre-feet per year HEU permit and 0.71 acre-feet per year operating permit for a total of 6.71 acre-feet or 2,186,463 gallons per year as a four-well aggregated system to produce groundwater for irrigation of the Salado ISD student athletic fields.
Operating Permit Hearing related to:

Well #
N3-25-002P

Session Harrell & Amber Dankert9652 Stinnett Mill Rd
Salado, TX 76571(254) 421-2707
 

Well # N3-25-002P

The existing well will be completed to the Edwards BFZ Aquifer and are equipped with a maximum 1¼ -inch column pipe at a maximum pumping rate of 10 gallons per minute. The well is located in the Edwards BFZ Management Zone on a 3.6-acre tract located at 9652 Stinnett Mill Rd, Salado, TX 76571.

Latitude 30.970194º
Longitude -97.502353º

Request for an operating permit on an existing well,
N3-25-002P to authorize the withdrawal from the Edwards BFZ Aquifer for domestic use not to exceed 1.0 acre-feet or 325,581 gallons per year.

La solicitud de permiso de operación para un pozo exento existente autorizaría al solicitante a operar dentro del Distrito de Conservación de Aguas Subterráneas de Clearwater, de acuerdo con los términos y condiciones especificados en la solicitud, sujeto a la deliberación y aprobación de la junta, con posibles límites y disposiciones especiales. Quien desee presentar una Solicitud de Audiencia de Caso Controvertido, en relación con el Permiso de Operación propuesto, según la Norma del Distrito 6.10.15(d), y no pueda comparecer a la audiencia en la fecha y hora indicadas anteriormente, deberá también presentar una solicitud de aplazamiento ante el CUWCD, demostrando una causa justificada para no poder comparecer.

Las Solicitudes de Permiso y Enmiendas al Permiso, de ser aprobadas, autorizarían al titular del permiso a operar pozos dentro del Distrito de Conservación de Aguas Subterráneas de Clearwater, de acuerdo con los términos y condiciones establecidos en el permiso. Quien desee presentar una Solicitud de Audiencia de Caso Controvertido según la Regla 6.10.15(d) del Distrito y no pueda comparecer a la audiencia en la fecha y hora indicadas anteriormente, también deberá presentar una solicitud de aplazamiento ante el CUWCD, demostrando una causa justificada para no comparecer.

Para obtener información adicional sobre esta solicitud o el proceso de permisos, o para solicitar información sobre los requisitos legales sobre lo que debe incluirse para que una Solicitud de Audiencia de Caso Controvertido sea válida, comuníquese con CUWCD al 700 Kennedy Court (PO Box 1989) Belton, Texas, 76513, 254-933-0120.

ISSUED this 28th day of February 2025 in Belton, Texas, on the recommendation of the General Manager.

I, the undersigned authority, do hereby certify that the above NOTICE OF PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice.  I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on February 28, 2025 and remained posted continuously for at least 10 (ten) days immediately preceding the day of said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.

Dated: 2/28/2025

Distrito de conservación de agua subterránea de Clearwater

Por: Haga clic aquí para ver el documento original firmado
Dirk Aaron, Gerente General

Categorías: