NOTICE of CANCELLATION

OF PERMIT HEARING OF THE CLEARWATER UNDERGROUND WATER CONSERVATION DISTRICT

In accordance with Governor Abbott’s declaration of the COVID-19 public health threat, action to temporarily suspend certain provisions of the Texas Open Meetings Act, and Executive Order, a quorum of CUWCD’s Board of Directors will NOT hold this scheduled Public Hearing as previously noticed. Notice is hereby given that the Board of Directors for the Clearwater Underground Water Conservation District having set the public hearing for April 14, 2021 at 1:30 p.m., HAS CANCELLED THE SAID HEARING UNTIL FURTHER NOTICE. Applications for Permits as described below will not be heard as previously noticed, in compliance with the Texas Open Meetings Act.  The public may access future meeting and make public comment by going to the District Website http://www.cuwcd.org/ for the contact information and instructions of which will be available per a future notice.

The hearing will NOT be conducted on the following applications:

Applicant’s File Number/NamePermit Applicant/Holder and LandownerLocation of Well/WellsProposed Annual Groundwater Withdrawal Amount & Purpose of Use
Continue Operating Permit Hearingrelated to:N2-20-007GExisting Well Victory Rock TX LLCc/o Jon TaliaferroProject ManagerSage ATC Environmental715 Discovery Blvd, Suite 301Cedar Park, TX 78613 361-215-9994Existing well will be reworked and equipped with a maximum 2-inch column pipe for a submersible pump rated at 18.6 gallons per minute on the 283-acre tract located at 7170 Solana Ranch Rd West, Jarrell Texas 76537-5008, Latitude 30.876156ºLongitude -97.609424º Request for an Operating Permit on an existing well,N2-20-007Gfor withdrawal of 30 acre- ft/year or 9,775,000 gallons per year, from the Hensell layer (Middle) of the Trinity Aquifer with a 2-inch column pipe at 18.6 gallons per minute to produce groundwater for the purpose of mining and crushing aggregates. 
Combination Drilling &Operating Permit N2-21-001P    Victory Rock TX LLCc/o Jon TaliaferroProject ManagerSage ATC Environmental715 Discovery Blvd, Suite 301Cedar Park, TX 78613 361-215-9994  New well will be drilled and equipped with a maximum 2-inch column pipe for a submersible pump rated at 20 gallons per minute on the 283-acre tract located at 7170 Solana Ranch Rd West, Jarrell Texas 76537-5008, Latitude 30.878055ºLongitude -97.609444ºRequest for a Combination Drilling/Operating Permit from a new well,N2-21-001Pfor withdrawal of 30 acre- ft/year or 9,775,000 gallons per year, from the Hosston layer (Lower) of the Trinity Aquifer with a 2-inch column pipe at 20 gallons per minute to produce groundwater for the purpose of mining and crushing aggregates. 
Combination Drilling & Operating PermitN1-21-001P    Kelly CarterP.O. Box 339Holland TX 76534 512-560-2573 Permit will authorize the withdrawal from a new well completed in the Alluvial Aquifer with a 1 ¼-inch column pipe on a 4.01-acre tract located at 15526 Hawk Lane, Holland, Texas, Latitude 30.869424ºLongitude -97.359764ºRequest for a Drilling Permit to construct and complete a well for domestic use. N1-21-001P to be drilled and completed for withdrawal 0.87 ac-ft per year or 283,970 gallons per year from the Alluvial Aquifer with a 1 ¼ inch column pipe at 5 gallons per minute to produce groundwater for domestic use.

The Applications for Permit and Permit Amendments, if granted, would authorize the permit holders to operate wells within the Clearwater Underground Water Conservation District according to the terms and conditions set forth in the permit.

ISSUED this 7st day of April 2021 in Belton, Texas, on the recommendation of the General Manager.

I, the undersigned authority, do hereby certify that the above NOTICE OF CANCELLATION OF SAID PERMIT HEARING of the Board of Directors of the Clearwater Underground Water Conservation District is a true and correct copy of said Notice.  I have posted a true and correct copy of said Notice at the District office located in Belton, Texas, and said Notice was posted on April 7, 2021, and remained posted continuously for at least 10 (ten) days immediately preceding the day of said hearing; a true and correct copy of said Notice was furnished to the Bell County Clerk, in which the above-named political subdivision is located.

Dated 04/07/2021
Clearwater Underground Water Conservation District
By:  Click here for original signed document
Dirk Aaron, General Manager